|
|
|
Click on one of the following to view our experience within the selected service:
|
|
|
|
|
Civil & Structural Engineering Back To Top
- Systems & Component Design /
Modifications / Evaluations
- Structural Evaluations & Designs of Steel and Concrete Structures and Structure and Equipment Foundations
- Seismic II Over I Interaction Evaluations
- Seismic Analyses
- Equipment Seismic Qualification including Commercial Parts Dedication (STERI, SQUG)
- BWR Mark I Analysis
- Containment Analysis
- Heavy Loads / Lifting Device Design
- Load Drop Evaluations
- Spent Fuel Pool Integrity Evaluations
- Tornado Evaluations
- Building Design
- Pressure Vessels
- ECCS Strainers
- Finite Element Analyses Design Verification and Evaluations
|
|
|
|
Electrical Engineering Back To Top
- Conceptual, Detailed Design, Specification and Procurement Services
- Short-Circuit Studies
- Protective-Device Coordination Studies
- System and Equipment Grounding Studies
- Surge and Lighting Protection Studies
- Voltage Studies
- Motor Starting Studies
- Reliability Studies
- Energy Efficiency Studies
- Analysis of Auxiliary Electrical Systems
- Tray Overload
- Testing & Support
|
|
|
|
Equipment Qualification Back To Top
Environmental Qualification
Program Services to meet the intent of 10CFR50.49, NUREG 0588 Category I,
NUREG 0588 Category II, 79-01B (DOR Guide Lines) and Regulatory Guides 1.89 and 1.97:
- Prepare / Revise EQ Packages
- Lubricant Qualification
- Shelf Life Considerations
- EQ Training
- NRC Information Notice and Bulletin Response
- Upgrade to Cat I from Cat II or DOR
- Mechanical Equipment Qualification or Program Removal Services
- EQ Testing and Test Plan Preparation
- Reducing EQ Maintenance Burdens
- Equipment (Instrument) Loop Inaccuracy Calculations
- FMEA
- EQ Maintenance Analysis
- Leakage Current Evaluations
- Thermal Lag Analysis
- Field Walkdown for EQ Configuration and External Connections
- NRC, AE Industry Audit Support
- EQ Maintenance and Surveillance Procedures
- Operability for Station Blackout Response Equipment
- Equipment Evaluation due to Impact of Power
Uprate
Seismic Qualification
- Seismic Packages
- Seismic Testing
- Seismic Analysis
- Finite Element Studies
- Seismic Walkdown
- Foundation and Mounting Calculations
- Seismic Considerations for Configuration Control
Parts Qualification
- Parts Classification for
EQ/Non-EQ
- Parts Procurement
- Parts Obsolence
- Component Dedication Program
Environmental Qualification
- Component Classification for Nuclear Plants
|
|
|
|
Fire Protection, Appendix R & Safe Shutdown Back To Top
- Appendix R Support Services
- Safe Shutdown Analysis
- Safe Shutdown Separation Analysis
|
|
|
|
Instrumentation & Controls Engineering Back To Top
- Control, Indication and Monitoring Systems and Equipment Design Services in Support of Initial Design, Retrofits and Upgrades
- Control Room, Relaying Room and Remote Control Panel / Rack Design Services in Support of Initial Design, Retrofits and Upgrades
- Instrument Loop Uncertainty and Setpoint Calculations
- Pneumatic, Analog, Digital, and Smart System Evaluations and Upgrades
- Circuit, Equipment, and Component Analysis, FMEA, Root Cause Evaluations, Diagnostics, and Testing Support
- Technical Specifications, Procurement,
and Receipt/Inspection
- Spare Parts Evaluations
- Field Engineering Support
- Implementation Support
- Equipment & Component Diagnostics & Testing Support
|
|
|
|
Mechanical/Nuclear Engineering Back To Top
Mechanical/Nuclear Engineering Services
- BOP/NSSS Systems Design
- Mechanical Design
- Plant General Arrangement Drawings
- System Flow Diagrams
- System Piping and Instrumentation Diagrams (P&IDs)
- Physical Layout Drawings of Piping
- Piping / Pipe Support Design / Piping Analysis
- HVAC
- Stress Analysis
- Thermal Hydraulics
- Containment Analysis
Programmatic Services
- Design Basis Documentation (DBD) Program Services
- Inservice Testing Program Services for Pumps, Valves, and Snubbers
- Pumps, Valves, and Snubbers
- Nuclear Engineering
- Nuclear Fuel Management
- Nuclear Process Engineering
- Radiological Protection
- Waste Management
- Water Treatment
|
|
|
|
Plant Operation & Safety Back To Top
- Technical Licensing Positions
- Independent Safety Design Review – Nuclear Safety-Related Design Documents
- Maintaining FSAR Record of Changes
- Maintaining Changes and List of Materials to Fire Hazard Analysis
- Supporting Evaluations Under 10CFR60.55(a) and 10CFR21
- Supporting Evaluations of Safety Issues Identified in NRC Generic Letters or IE Bulletins and Information Notices, including Utility Originated Changes
- 10CFR50.59 Evaluations
- FSAR Updates per 10CFR50.71(e)
- Environmental Qualification per 10CFR50.49, IE Bulletin 79-01 through 01B Regulatory Guides 1.89 and 1.79, and DOR Guidelines
- Supporting Material Substitution Programs and Industry Activities
- Fire Protection Studies Relative to 10CFR50.48 and Appendix R Backfits
- TMI Lessons Learned Implementation Evaluations
- Power Uprate
- Steam Generator Replacement Support
- Containment Purge
- 10CFR21 Evaluations (Modifications)
- Developing Responses to IE Bulletins and Generic Letters and Review of IE Information Notices
- Plant Technical Specifications Reviews
- Emergency Preparedness Support
- Owner Initiated Utility Assessment Support
- Twenty-Four Month Operating Cycle Support
|
|
|
|