Civil & Structural Engineering          Back To Top

  • Systems & Component Design / Modifications / Evaluations
  • Structural Evaluations & Designs of Steel and Concrete Structures and Structure and Equipment Foundations
  • Seismic II Over I Interaction Evaluations
  • Seismic Analyses
  • Equipment Seismic Qualification including Commercial Parts Dedication (STERI, SQUG)
  • BWR Mark I Analysis
  • Containment Analysis
  • Heavy Loads / Lifting Device Design
  • Load Drop Evaluations
  • Spent Fuel Pool Integrity Evaluations
  • Tornado Evaluations
  • Building Design
  • Pressure Vessels
  • ECCS Strainers
  • Finite Element Analyses Design Verification and Evaluations


Electrical Engineering          Back To Top

  • Conceptual, Detailed Design, Specification and Procurement Services
  • Short-Circuit Studies
  • Protective-Device Coordination Studies
  • System and Equipment Grounding Studies
  • Surge and Lighting Protection Studies
  • Voltage Studies
  • Motor Starting Studies
  • Reliability Studies
  • Energy Efficiency Studies
  • Analysis of Auxiliary Electrical Systems
  • Tray Overload
  • Testing & Support


Equipment Qualification          Back To Top

  Environmental Qualification
  Program Services to meet the intent of 10CFR50.49, NUREG 0588 Category I,
  NUREG 0588 Category II, 79-01B (DOR Guide Lines) and Regulatory Guides 1.89 and 1.97:
  • Prepare / Revise EQ Packages
  • Lubricant Qualification
  • Shelf Life Considerations
  • EQ Training
  • NRC Information Notice and Bulletin Response
  • Upgrade to Cat I from Cat II or DOR
  • Mechanical Equipment Qualification or Program Removal Services
  • EQ Testing and Test Plan Preparation
  • Reducing EQ Maintenance Burdens
  • Equipment (Instrument) Loop Inaccuracy Calculations
  • FMEA
  • EQ Maintenance Analysis
  • Leakage Current Evaluations
  • Thermal Lag Analysis
  • Field Walkdown for EQ Configuration and External Connections
  • NRC, AE Industry Audit Support
  • EQ Maintenance and Surveillance Procedures
  • Operability for Station Blackout Response Equipment
  • Equipment Evaluation due to Impact of Power Uprate
  Seismic Qualification
  • Seismic Packages
  • Seismic Testing
  • Seismic Analysis
  • Finite Element Studies
  • Seismic Walkdown
  • Foundation and Mounting Calculations
  • Seismic Considerations for Configuration Control
  Parts Qualification
  • Parts Classification for EQ/Non-EQ
  • Parts Procurement
  • Parts Obsolence
  • Component Dedication Program
  Environmental Qualification
  • Component Classification for Nuclear Plants


Fire Protection, Appendix R & Safe Shutdown          Back To Top

  • Appendix R Support Services
  • Safe Shutdown Analysis
  • Safe Shutdown Separation Analysis


Instrumentation & Controls Engineering          Back To Top

  • Control, Indication and Monitoring Systems and Equipment Design Services in Support of Initial Design, Retrofits and Upgrades
  • Control Room, Relaying Room and Remote Control Panel / Rack Design Services in Support of Initial Design, Retrofits and Upgrades
  • Instrument Loop Uncertainty and Setpoint Calculations
  • Pneumatic, Analog, Digital, and Smart System Evaluations and Upgrades
  • Circuit, Equipment, and Component Analysis, FMEA, Root Cause Evaluations, Diagnostics, and Testing Support
  • Technical Specifications, Procurement, and Receipt/Inspection
  • Spare Parts Evaluations
  • Field Engineering Support
  • Implementation Support
  • Equipment & Component Diagnostics & Testing Support


Mechanical/Nuclear Engineering          Back To Top

  Mechanical/Nuclear Engineering Services
  • BOP/NSSS Systems Design
  • Mechanical Design
  • Plant General Arrangement Drawings
  • System Flow Diagrams
  • System Piping and Instrumentation Diagrams (P&IDs)
  • Physical Layout Drawings of Piping
  • Piping / Pipe Support Design / Piping Analysis
  • HVAC
  • Stress Analysis
  • Thermal Hydraulics
  • Containment Analysis
  Programmatic Services
  • Design Basis Documentation (DBD) Program Services
  • Inservice Testing Program Services for Pumps, Valves, and Snubbers
  • Pumps, Valves, and Snubbers
  • Nuclear Engineering
  • Nuclear Fuel Management
  • Nuclear Process Engineering
  • Radiological Protection
  • Waste Management
  • Water Treatment


Plant Operation & Safety          Back To Top

  • Technical Licensing Positions
  • Independent Safety Design Review Nuclear Safety-Related Design Documents
  • Maintaining FSAR Record of Changes
  • Maintaining Changes and List of Materials to Fire Hazard Analysis
  • Supporting Evaluations Under 10CFR60.55(a) and 10CFR21
  • Supporting Evaluations of Safety Issues Identified in NRC Generic Letters or IE Bulletins and Information Notices, including Utility Originated Changes
  • 10CFR50.59 Evaluations
  • FSAR Updates per 10CFR50.71(e)
  • Environmental Qualification per 10CFR50.49, IE Bulletin 79-01 through 01B Regulatory Guides 1.89 and 1.79, and DOR Guidelines
  • Supporting Material Substitution Programs and Industry Activities
  • Fire Protection Studies Relative to 10CFR50.48 and Appendix R Backfits
  • TMI Lessons Learned Implementation Evaluations
  • Power Uprate
  • Steam Generator Replacement Support
  • Containment Purge
  • 10CFR21 Evaluations (Modifications)
  • Developing Responses to IE Bulletins and Generic Letters and Review of IE Information Notices
  • Plant Technical Specifications Reviews
  • Emergency Preparedness Support
  • Owner Initiated Utility Assessment Support
  • Twenty-Four Month Operating Cycle Support